Solution

The specification of a component's contribution to the cost of the integrated circuit containing it is typically determined by several factors:

  1. Material Cost: This includes the cost of the raw materials used to manufacture the component.

  2. Manufacturing Cost: This includes the cost of the labor, machinery, and technology used in the production process.

  3. Design Complexity: More complex designs often require more resources, which can increase the cost.

  4. Quantity: The number of components produced can also affect the cost. Larger quantities often result in lower costs per unit due to economies of scale.

  5. Market Demand: The market demand for a particular component can also influence its cost. If the demand is high, the cost may increase.

  6. Research and Development: The cost of research and development can also contribute to the overall cost of the component. This includes the cost of designing the component and testing its performance.

  7. Overhead Costs: These are the indirect costs associated with producing a component, such as administrative expenses, utilities, and rent.

By considering all these factors, one can specify a measure of a component's contribution to the cost of the integrated circuit containing it.

This problem has been solved

Similar Questions

In addition to total cost, it is useful to calculate cost because it can be compared directly to the price

costs, also called differential costs, are the additional costs from selecting a certain course of action.

?   in a circuit is the amount of work being done per unit of time.a.Currentb.Capacitancec.Inductanced.Power

The extra or additional cost associated with the production of an additional unit of output is the cost.

Fill in the Blank QuestionFill in the blank question.A cost includes both fixed and variable components.

1/1

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.