45.A change in total cost caused by adding one more unit to the production total is called:  A. Fixed cost.  B. Variable cost.  C. Marginal cost  D. Total cost

Question

A change in total cost caused by adding one more unit to the production total is called:

  • A. Fixed cost
  • B. Variable cost
  • C. Marginal cost
  • D. Total cost
🧐 Not the exact question you are looking for?Go ask a question

Solution

Break Down the Problem

  1. Identify the core concept being asked in the question.
  2. Evaluate the options provided.

Relevant Concepts

  1. Fixed Cost: Costs that do not change with the level of production or sales.
  2. Variable Cost: Costs that vary with the level of production.
  3. Marginal Cost: The change in total cost that arises from producing one additional unit of a product.
  4. Total Cost: The total expense incurred in reaching a particular level of output.

Analysis and Detail

  1. The question specifically asks for the cost associated with increasing production by one unit.
  2. Marginal Cost (Option C) directly refers to this change in total cost when production is increased by an additional unit, distinguishing it from fixed and variable costs.

Verify and Summarize

  1. Given that the term defined in the question is associated with the incremental change tied to an increase in production, the most precise option is indeed Marginal Cost.

Final Answer

C. Marginal cost

This problem has been solved

Similar Questions

43.Under the Marginal cost pricing, the price is determined on the basis of;  A. Fixed cost  B. Variable cost  C. Total cost  D. Average cost

The extra or additional cost associated with the production of an additional unit of output is the cost.

The incremental cost of building the next unit of a good is called the:Group of answer choicesmarginal costLaw of One Pricefixed costvariable cost

____ are also known as direct costs A. average variable costs B. average fixed costs C. variable costs D. total fixed costs

At a production level of 5,600 units, a project has total costs of $89,000 and a variable cost per unit of $11.20. What is the amount of the total fixed costs?

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.