If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines?
Question
Solution 1
First, we need to establish the relationship between the number of workers and the number of machines.
From the problem, we know that 12 workers are needed to run 4 machines. This means that each machine requires 12/4 = 3 workers to run.
If each machine requires 3 workers, then to find out how ma Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study prob
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solv
Similar Questions
If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines?
If 24 workers can build a house in 40 days, how many workers will be required to build the same house in 20 days?
If 7000 bags of palay is to be piled 20-bags high, how many square meters of floor space is needed? (0.23 m/bag)
How many molecules of water are needed to completely hydrolyz polymer that is 21 monomers long? (a) 10 (c) 21 (b) 20 (d) 2
How many point-to-point WANs are needed to connect n LANs if each LANshould be able to directly communicate with any other LAN?