Work exceeding 2.50m height above finished floor level must be described in 1.50m stages True False

Question

Work exceeding 2.50m height above finished floor level must be described in 1.50m stages

  • True
  • False
🧐 Not the exact question you are looking for?Go ask a question

Solution

The statement "Work exceeding 2.50m height above finished floor level must be described in 1.50m stages" refers to a safety regulation or standard in construction or working at heights.

Analysis

  1. Understanding the Requirement: Typically, safety regulations require that work at heights be broken down into manageable stages to minimize risk.
  2. Height Specification: The specification of 2.50m as a height that requires staging is a common safety guideline in construction work.
  3. Stage Height: The mention of 1.50m as the staging increment is also in line with general practice in construction safety, where such increments are recommended.

Conclusion

Based on standard safety practices in construction, the statement is True. Work exceeding 2.50m in height should indeed be described or managed in stages of 1.50m for safety compliance.

This problem has been solved

Similar Questions

When the force applied and the displacement of the body are inclined at 90º with each other, then work done isA infinite B maximum C unity D zero

How much work is done when you hold a 10 N object 10 m above the ground?100 J1000 JMore information is needed 0 J - no work is done50 J

For work tasks based on physical labour, work breaks will always result in a decrease in efficiency.Multiple ChoiceFalseTrue

Fill in the blank with the correct determiner.It seems they will need Drag Your Answer workers to finish the project.

Do the same task as Step B but only for Instructors whose salary is greater than $50,000

1/1

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.