The addAfter operation of an unordered list collection is A. O(log n) B. O(n) C. a higher order than O(n log n) D. O(n log n) E. O(1)

Question

The addAfter operation of an unordered list collection is A. O(log n) B. O(n) C. a higher order than O(n log n) D. O(n log n) E. O(1)
🧐 Not the exact question you are looking for?Go ask a question

Solution 1

The addAfter operation of an unordered list collection is B. O(n). This is because in an unordered list, to add an element after a specific one, you would need to traverse the list until you find the specified element. In the worst case scenario, this could take traversing through 'n' elements, henc Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study prob

Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solv

This problem has been solved

Similar Questions

The addAfter operation of an unordered list collection is A. O(log n) B. O(n) C. a higher order than O(n log n) D. O(n log n) E. O(1)

What is the time complexity of the enqueue operation in a queue implemented using a linked list?O(1)O(n)O(log n)O(n log n)

The time required to delete a node x from a doubly linked list having n nodes is(A) O (n)(B) O (log n)# (C) O (1)(D) O (n log n)(E)n/2

What is the space complexity for deleting a linked list?a) O(1)b) O(n)c) Either O(1) or O(n)d) O(log n)

In an ideal implementations of a queue, all operations are ______________________ . A. O(1) B. O(n) C. O(n2) D. it depends on the operation E. O(n log n)

1/3