It takes four workers four and a half days to build a little bridge over a stream.How long would it take two workers to build the same bridge at the same rate?

Question

It takes four workers four and a half days to build a little bridge over a stream. How long would it take two workers to build the same bridge at the same rate?

🧐 Not the exact question you are looking for?Go ask a question

Solution

1. Break Down the Problem

To find out how long it would take two workers to build the bridge, we first need to establish the total work done, which can be measured in worker-days.

2. Relevant Concepts

The total work can be given in terms of "worker-days", which is the product of the number of workers and the number of days they work. If we denote the number of workers as W W and the number of days as D D , the total work can be represented as: Total Work=W×D \text{Total Work} = W \times D

3. Analysis and Detail

Given that:

  • W=4 W = 4 workers,
  • D=4.5 D = 4.5 days,

The total work in worker-days is: Total Work=4 workers×4.5 days=18 worker-days \text{Total Work} = 4 \text{ workers} \times 4.5 \text{ days} = 18 \text{ worker-days}

Now we need to find out how many days D D' it would take for 2 workers to complete the same amount of work. We can set up the equation: Total Work=2 workers×D days \text{Total Work} = 2 \text{ workers} \times D' \text{ days} Thus: 18=2×D 18 = 2 \times D' Solving for D D' : D=182=9 days D' = \frac{18}{2} = 9 \text{ days}

4. Verify and Summarize

After performing the calculations, we find that it will take 2 workers 9 days to build the same bridge, confirming our analysis.

Final Answer

It would take two workers 9 days to build the same bridge.

This problem has been solved

Similar Questions

A house takes eight hours to be built by four men. How much time would it take one man to build it?

If a wall is built in ten hours by 8 men how many hours will it take four men to build it?

If it takes 3 people 2 hours to paint a wall, how long will it take 6 people to paint the same wall, assuming they work at the same rate?

It takes some bricklayers 28 hours to build a 168 m wall.How long will it take them to build a 42 m wall?

f 6 men can complete a work in 15 hours. Then how many hours it will take if 10 men working at the same speed complete the work?

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.