To determine the number of workers needed in Packing Group B to ship 110,550 units during the shift, we need to consider several factors such as the production rate per worker, the shift length, and overall efficiency. Here are the steps to break down the problem and calculate the required number of workers:

1. Break Down the Problem

  1. Identify the total number of units to be packed: 110,550 units.
  2. Establish the average number of units that one worker can pack in a shift.
  3. Determine the total time available in the shift.

2. Relevant Concepts

  • Let u u be the units packed per worker per shift.
  • Let w w be the number of workers required.
  • The relationship can be formulated as: w=Total UnitsUnits per Worker w = \frac{\text{Total Units}}{\text{Units per Worker}}

3. Analysis and Detail

Assuming, for example, that each worker can pack 500 units during the shift. The calculation would be: w=110,550 units500 units/worker=221.1 w = \frac{110,550 \text{ units}}{500 \text{ units/worker}} = 221.1 Since we cannot have a fraction of a worker, we round up to the next whole number, which means we will need 222 workers.

4. Verify and Summarize

It's crucial to verify our assumptions about the average packing rate per worker. If the packing rate is correct, then the calculated number of workers should be sufficient to meet the shipping goal of 110,550 units.

Final Answer

To ship 110,550 units for the shift, you will need 222 workers in Packing Group B, assuming each worker can pack 500 units. If the rate changes, the number of required workers will also change accordingly.

This problem has been solved

Similar Questions

For situation A (above) what is the transshipment constraint for the warehouse in Charleston (𝑥7)?Group of answer choices𝑥14+𝑥15+𝑥16−𝑥78−𝑥79−𝑥710

If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines?

When designing operations systems, one should start by determining the ____.Group of answer choicesproduct-service mixcapacitylayoutlocation

Austin has completed 12 deliveries so far this week. He needs to make 60 deliveries for the week. What percentage of his deliveries has Austin completed?

f 6 men can complete a work in 15 hours. Then how many hours it will take if 10 men working at the same speed complete the work?

1/1

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.