A bicycle can put out 4,400 J of work. How much work input is needed for the bicycle to reach 70% efficiency?
Question
A bicycle can put out 4,400 J of work. How much work input is needed for the bicycle to reach 70% efficiency?
Solution
To determine the work input needed for the bicycle to reach 70% efficiency, we can use the formula:
Efficiency = (Work output / Work input) * 100
Given that the bicycle can put out 4,400 J of work and the desired efficiency is 70%, we can rearrange the formula to solve for the work input:
Work input = (Work output / Efficiency) * 100
Substituting the given values:
Work input = (4,400 J / 70%) * 100
To calculate this, we first need to convert the efficiency from a percentage to a decimal:
Efficiency = 70% = 0.70
Now we can substitute the values into the formula:
Work input = (4,400 J / 0.70) * 100
Simplifying the equation:
Work input = 6,285.71 J
Therefore, the work input needed for the bicycle to reach 70% efficiency is approximately 6,285.71 J.
Similar Questions
A machine has an efficiency of 61 percent. Find the input work if the output work is 140 J.
A heat engine has an efficiency of 35.0% and receives 150 J of heat per cycle. How much work does it perform in each cycle?
A forklift uses 5200 J of energy to lift a 50.0 kg mass to a height of 4.0 m at a constantspeed. What is the efficiency of the forklift?
A system with an efficiency of 74% wastes 230 W of power.What is the useful output power of the system?A 170 W B 310 W C 650 W D 880 W
electric bicycle is sold Rs. 15300 to earn a profit of 3 %. What should be the Selling price of the electric bicy such that a profit of 7 % is achieved?
Upgrade your grade with Knowee
Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.