These are part of the Techniques for Estimating Project Costs, except:*A. Three-Point EstimationB. Analogous EstimationC. Direct Labor Expense
Question
These are part of the Techniques for Estimating Project Costs, except:
- A. Three-Point Estimation
- B. Analogous Estimation
- C. Direct Labor Expense
Solution
The correct answer is C. Direct Labor Expense. This is not a technique for estimating project costs. The other two options, A. Three-Point Estimation and B. Analogous Estimation, are both recognized techniques for estimating project costs.
Three-Point Estimation is a technique that uses three estimates to define an approximate range for an activity’s cost: Most Likely (Cm), Optimistic (Co), and Pessimistic (Cp). The estimate is then calculated using the formula (Co + 4Cm + Cp) / 6.
Analogous Estimation, also known as Top-Down Estimation, involves estimating the cost of an activity based on the known cost of a similar activity.
Direct Labor Expense, on the other hand, is a type of cost associated with a project, but it is not a technique for estimating project costs.
Similar Questions
Which type of project cost estimate is the most accurate?a.Order of magnitudeb.Preliminaryc.Conceptuald.Definitive
1. Explain software project estimation and discuss the various techniques used for software project estimation.
The cost baseline is developed during which process?Develop scheduleDetermine budgetEstimate costsMonitor & control project work
otal of all direct costs is termed as .a.cost of production.b.cost of sales.c.prime cost.d.works cost.
Which of the following are cost estimating methods recommended by NRM1? Cost per m2 Work package Functional unit Elemental cost planning Elemental