A and B can complete a work in 6 days.A can alone do it in 10 days.Then B can alone do the work in how many days?A13.75 daysB14 daysC16 daysD15 days

Question

A and B can complete a work in 6 days.A can alone do it in 10 days.Then B can alone do the work in how many days?A13.75 daysB14 daysC16 daysD15 days
🧐 Not the exact question you are looking for?Go ask a question

Solution 1

To solve this problem, we need to understand the concept of work and rate.

Step 1: Find the rates of A and B working together. Since A and B can complete the work in 6 days, their combined rate is 1 work/6 days = 1/6 work per day.

Step 2: Find the rate of A working alone. Since A can complete t Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study prob

Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solve study problem.
Knowee AI StudyGPT is a powerful AI-powered study tool designed to help you to solv

This problem has been solved

Similar Questions

A and B can complete a work in 6 days.A can alone do it in 10 days.Then B can alone do the work in how many days?A13.75 daysB14 daysC16 daysD15 days

A and B complete a work in 6 days. A alone can do it in 10 days. If both together can do the work in how many days?a. 6 daysb. 4 daysc. 5 daysd. 3.75 days

A and B together can complete a piece of work in 35 days, while A alone can complete it in 60 days. So, B alone can complete the work in how many days?

A and B together can do a specific work in 8 days. B alone can do it in 10 days, then time taken by A alone is?

A and B together can do a specific work in 8 days. B alone can do it in 10 days, then time taken by A alone is