Given the CPM/PERT project network segment the latest finish (LF) times for activity 3 isGroup of answer choices8752
Question
Given the CPM/PERT project network segment the latest finish (LF) times for activity 3 is
Group of answer choices 8752
Solution
To find the Latest Finish (LF) time for activity 3 in a CPM/PERT network, we need to follow the general process associated with the critical path method. Here’s how to approach it:
1. ### Break Down the Problem
- Identify the relevant project activities and their relationships to each other.
- Gather information about the finish times of dependent activities to calculate the LF for activity 3.
2. ### Relevant Concepts
- PERT (Program Evaluation Review Technique) and CPM (Critical Path Method) allow us to analyze project timelines.
- The latest finish time (LF) for an activity is determined by subtracting the duration of the activity from the earliest finish time (EF) of its successor activities.
3. ### Analysis and Detail
- Let's assume activity 3 has a certain duration and is linked to the subsequent activities. You need the latest start (LS) and the EF of activity 4 (or other dependent activities).
- If activity 3 is crucial for the overall project schedule, its LF will influence both LS and EF for subsequent activities.
- The formula is:
4. ### Verify and Summarize
- Once you have calculated or deduced the finish times of the other activities interfering with or succeeding activity 3, you will be able to accurately state the LF.
- Verify that the values used in calculations correspond to the activity timing.
Final Answer
Without additional details about the project timeline or the duration of activities, it is not possible to provide a numerical answer for the Latest Finish time. If the provided options are "8752", you would need to confirm against your own project data/documents regarding LF for activity 3.
Similar Questions
In a CPM analysis, the activity's slack time can be determined by subtracting the early start from the early finish.Group of answer choicesTrueFalse
The earliest finish time for an activity is equal to the latest finish time minus the activity slack.Group startsTrue or False
The latest possible time an activity can start without delaying the projecta.Latest start timeb.Latest finish timec.Project Costd.Duration
Represents the amount of time an activity can be delayed without impacting the critical path or project completion.a.Slackb.Nodesc.Activitiesd.Duration
Multiple Choice QuestionPERT uses ____ for each activity.Multiple choice question.three time estimatesfour time estimatesone time estimatetwo time estimates